PME is honored to participate in three times according to four times for Turnarround at Binh Son Refinery with value added.

d’ici

As a subcontractor, PME’s ability during Turnarround go beyond Scaffolding, Insulation, Catalyst Replacement to taking responsibility for complex tax in high technical skills as follow:

  • Labor: 500 persons
  • Machine & Equipments: 120 machines
  • Place: U15, U16, U17 (Package 1), U12, U13, U23, U25 (Package 2)
  • Catalyst Replacement at RFCC, CCR, SRU, NHT,…
  • Insulation ~ 1.000m2
  • Move/Remove Valve: 250 Valves
  • Renew & Repair ~ 20.000 DI
  • Inspection and Repair ~ 30 tanks & volume
  • Scaffolding ~ 30.000m3

                                                              Management of BSR inspecting PME’s work during 4th Turnarround

Toolbox meeting at BSR

Move & Remove valve

Distributer Replacement

Bolt Tensioning by Hydronic Tensining

Slide Valve SV1501 BSR TA4

Cyclone Replacement – BSR TA4